How long refinishing takes

Three to five days for most homes, then a cure that keeps going after the crew leaves. Here is what happens in between, and what you can do to keep it on schedule.

The guide

3 min read · Updated October 2026

The short answer

Three to five days for most jobs, from clearing the rooms to the last coat. Then the finish keeps curing: socks on the floor after about a day with a water-based finish, furniture back at four or five days, rugs after two to three weeks.

The four stages

The order never changes. How many days it takes depends on the square footage, the stain, and how many coats the floor gets.

  1. 01 Clear and seal — furniture out, vents taped, shoe molding pulled, doorways zipped off from the rest of the house
  2. 02 Sand — a coarse pass to take the old finish off, two finer passes to take out the scratches, edges and closets by hand
  3. 03 Color — samples on your own floor in your own light, then stain applied and wiped back one room at a time
  4. 04 Coat and cure — two or three coats of finish, buffed between, and the cure dates in writing before the last machine leaves

What makes it take longer

More rooms and stairs add days; stair treads and edges are sanded by hand. Stain adds drying time before the first coat can go on. Oil-based finish dries and cures far slower than water-based — weeks to fully cure instead of days.

Weather matters too. Finish dries slower in humid air, so a July job in Oklahoma can need more time between coats than the same floor in October. And if bad boards turn up once the floor is open, they are replaced before sanding — better then than after.

How to get the house ready

A few things before the crew arrives keep the schedule where it was quoted:

  • Empty the rooms being done — furniture, rugs, and anything on the floor of the closets
  • Take down pictures and shelves on the walls of those rooms; sanding vibrates the house
  • Plan where pets and kids will be: a fresh coat of finish holds every paw print
  • With an oil-based finish, gas pilot lights near the work are turned off while it dries — the fumes are flammable
  • Keep the heat or air running at normal settings; finish cures best in a steady house

Can you stay in the house?

On most refinishing jobs, yes. The sanders run into a sealed vacuum, so the dust stays out of your vents and cabinets, and the work area is zipped off. The nights the finish goes down are the exception, and you know which nights those are before the job starts — not the morning of.

Oil-based finish smells strongly for several days. With water-based it is far milder, which is one more reason people choose it.

After the last coat

A finish that is dry is not yet cured, and this is where most new floors get hurt. With a water-based finish:

  • Socks only for about the first day
  • Furniture back at four or five days — lift it, never drag it, and put felt pads under the legs
  • Rugs stay off for two to three weeks; a rug on an uncured finish leaves its outline behind
  • No wet mopping while the finish cures — a dry microfiber mop is enough

Straight answers

4 questions

Before the crew arrives

What people ask in the week before a refinish. Anything else, ask on the estimate — that is what it is for.

Water-based or oil-based finish?

Water-based dries clear and hard, cures in days instead of weeks, and smells like almost nothing — pick it when you want the wood to stay the color it is now. Oil-based ambers the wood and keeps ambering, which is what people mean when they say a floor looks warm.

Why can’t the rugs go back right away?

A finish that is dry is not yet cured. A rug laid on an uncured finish traps it and leaves its outline behind. Two to three weeks with a water-based finish keeps that from happening.

Does the weather change the schedule?

Humidity does. Finish dries slower in humid air, so summer jobs can need more time between coats. Your dates are in the written quote before anything starts.

How many coats does the floor get?

Two or three coats of finish, buffed between coats. The number for your floor is in the written quote, next to the finish and the color.

Free estimate

No charge, no obligation

Tell us about your floors

Call and we will set a time to measure, look at what you have, and put a written quote in your hands. Estimates are free anywhere we work, Stillwater included.

  1. 01

    You get in touch

    Tell us the rooms, roughly the square footage, and what the floor is doing now.

  2. 02

    We come measure

    We look at the subfloor, check moisture, and sample color on your own floor, in your own light.

  3. 03

    You get it in writing

    Square footage, materials, color, coats, and dates. The price you approve is the price you pay.

Hours

Mon – Fri: 8:00 AM – 5:00 PM · Sat – Sun: Closed

Worked with us? Review us on Google